• Map of Rumble Strip Mitigation

    We’re pleased to report that PennDOT has announced plans to mitigate (that is, eliminate) the rumble strips on the PA Bike Routes throughout Centre County. The link below will take you to a map (Adobe PDF format) of the planned construction.

    gis1201_bicycle_rumble_centre.pdf

    Here’s the post made to the CRBC listserv by V.P. Chuck Anderson:

    This morning [March 2, 2010]  Paul [Rito], Trish [Meek] and I had a conference call with PennDOT. PennDOT briefed us on the timeline and proposed method for repairing the improperly installed rumble strips. We had serious safety concerns over PnnDOT’s first repair proposal, so they came up with a new proposal which is much better.
    Here are the details:

    Routes to be fixed this year
    PennDOT will repair affected portions of state bike routes G and V this season. Places where 4¹ of paving extends outside of the rumble strips will not be changed since they are in accordance with PennDOT standards for edge line rumble strips. PennDOT asked which sections stre the highest priority, and we said 192 and 45 since they get the greatest bike use. PennDOT has created a map of the areas to be repaired and we will have that up on the CRBC website soon. PennDOT is also preparing a map of all rumble strips in our area and that map will also be posted to the CRBC website.

    Repair method
    1) Rumble strips will be removed by milling a 2 foot wide by 1.5-2 inch deep groove in the asphalt
    2) Groove will be filled with a fine-grained asphalt and rolled to match the height of the surrounding pavement
    3) Seam between new and old asphalt will be sealed to prevent water intrusion

    Timeline
    1) Road paving season in these parts starts in the summer
    2) The repairs will be put out to bid in May-June and a contractor will be hired to do the work
    3) We should start seeing action on the road by mid-summer and the work will be completed by the end of October
    4) We will receive updates, including heads up on when road work will be effecting roads, as the process moves forward

    No doubt many of you find the timing of this plan unsatisfactory.  It certainly does not fit with the time estimate given to us last fall, but that estimate was not realistic. The magnitude of the problem from a financial and technical standpoint is as great as it is for us riding the roads. The repair as proposed will make up a significant portion of this year¹s maintenance budget for our area.  I think we are looking at a significant response from PennDOT on the issue, not a best case scenario, but there are precious few of those these days when state government finances are involved.


  • Grumble Strip Update

    This is taken from 2 emails sent to the CRBC list serve on 2/21/2011 and 3/3/2011 sent by Chuck A.

    3/3/2011 Email

    Yesterday Paul Rito, a planner from COG, and I had a conference call with PennDOT. PennDOT briefed us on the time-line and proposed method for repairing the improperly installed rumble strips. We had serious safety concerns about PennDOT’s first repair proposal, so they came up with a new proposal which is much better. Here are the details:

    Routes to be fixed this year
    PennDOT will repair affected portions of state bike routes G and V this season. Places where 4’ of paving extends outside of the rumble strips will not be changed since they are in accordance with PennDOT standards for edge line rumble strips. PennDOT asked which sections are the highest priority, and we said 192 and 45 since they get the greatest bike use. PennDOT has created a map of the areas to be repaired which we have posted on the CRBC website at Rumble Strip Map. PennDOT is also preparing a map of all rumble strips in our area and that map will also be posted to the CRBC website when we get it from PennDOT. Roads not part of state route G&V will not be repaired this year.

    Repair method
    1) Rumble strips will be removed by milling a 2 foot wide by 1.5-2 inch deep groove in the asphalt
    2) Groove will be filled with a fine-grained asphalt and rolled to match the height of the surrounding pavement
    3) Seam between new and old asphalt will be sealed to prevent water intrusion

    Timeline
    1) Road paving season in these parts starts in the summer
    2) The repairs will be put out to bid in May-June and a contractor will be hired to do the work
    3) We should start seeing action on the road by mid-summer and the work will be completed by the end of October.
    4) Special previsions will be put in  the contract putting first priority on the 192 and 45 sections so they are completed first.
    4) We will receive updates, including heads up on when road work will be effecting roads, as the process moves forward

    No doubt many of you find the timing of this plan unsatisfactory.  It certainly does not fit with the time estimate given to us last fall, but that estimate was not realistic. The magnitude of the problem from a financial and technical standpoint is as great as it is for us riding the roads. The repair as proposed will make up a significant portion of this year’s maintenance budget for our area.  I think we are looking at a significant response from PennDOT on the issue, not a best case scenario, but there are precious few of those these days when state government finances are involved.

    Ride well,
    Chuck

    2/21/2011

    Hi everyone,

    On Feb 10 Paul Rito and I met with PennDOT, along with
    Pete F., Safety Enginner and Ryan’s boss, Eric B., a District 2 traffic
    Engineer, and Brian Sanders, PennDOT’s statewide Bicycle/Pedestrian
    Coordinator. Trish M. from COG was also there to help Paul and I interpret
    the lingo and understand how things fit into our local area. Most of the
    meeting was spent talking about PennDOT’s approach to bikes in their
    planning process and how CRBC can be more involved in future planning so
    problems like the rumble strips do not happen again. There is good news to
    report on both these fronts, but I will save it for another email. We also
    talked specifically about the rumble strips. Here is a summary of what we
    learned:

    1) The rumble strips were part of a nation-wide Federal Highway
    Administration program specifically funded to install center and edge line
    rumble strips.

    2) There are no additional rumble strips scheduled to be installed in our
    area.

    3) PennDOT’s design standard for rumble strips includes only installing them
    on roads with a history of head-on and/or run-off collisions, and where a
    minimum of 4′ of pavement will exist outside of the rumble strips after
    installation.

    4) As we know, there was a catastrophic breakdown between PennDOT’s design
    standard and what was done to our area roads.

    5) PennDOT acknowledges they screwed up and want to fix the problem, but
    here is where things get complicated…

    6) Fixing the problem requires repaving the whole road, or grinding down
    enough of the road’s edge to make room for a new layer of asphalt that will
    be stable and not make matters worse. Neither of these options is cheap and
    easy.

    7) The Federal funding used to install the rumble strips can not be used to
    fix the problem, and state and federal budget woes mean there is not a lot
    of discretionary money floating around to pay for the repairs.

    8) PennDOT’s current plan is to not reinstall the rumbles strips when the
    roads are resurfaced as part of the normal repaving schedule. Not a
    satisfactory resolution to the issue, but it is a starting point and better
    than no plan at all.

    9) Trish M. is advocating that PennDOT find a better solution that will
    get things fixed sooner. PennDOT is reviewing the issue and we hope to hear
    back soon.

    Paul and I were holding off on reporting all this to the list until after we
    learned the results of Trish’s efforts, but wanted to bring you up to speed
    now after the recent flurry of email concerning the rumble strips. We will
    pass along additional information as soon as we receive it. Hopefully in the
    coming week.


  • 2/7/2011 Meeting Minutes

    Meeting Minutes from 2/7/2011 Meeting at the SC Municipal Building

    Agenda Item #1 | Presentation | Ballengers Battle the Beast 

    CRBC member Jess Ballenger and his family have turned their love of cycling into a game. As a family they are making an effort to ride more than drive. Recorded car miles included vacation travel and trips to the market. The Ballengers only have one car and have been cycling for many years. 2011’s stats so far are 219 Bike, 769 beast including holidays. 219 miles through some of the coldest weather we have had in long time.  People at the meeting asked a lot of really great questions.

    Agenda Item # 2 | Working with the SCASD

    Tom Gasda phys ed teacher at State college Area High School talked about the SC High School’s efforts to include cycling safety into the curriculum. Members of the CRBC is working with the State College Area School District to help promote safe cycling. Physical education classes have been going on group rides, with the blessing of excursion permits signed by parents. There are a number of teacher that are excited about a bicycle education. The school is participating in bike to school day, as of this writing exact details have not been worked out, although there was some speculation about bike rack capacity.

    Agenda Item #3 | Bike to Work Month

    Bike to work month will be held in cooperation with anyone and everyone able to ride their bike to work.  Some of the events currently being proposed: bike rodeo, treasure hunt, vineyard ride, yoga/bike.  There will be a flyer that will be circulated with details. It was determined that Bike to work month includes all students riding to class. Places we hope to get advertising, CATA, Print Shops. There was even talk that we could use C-NET time to show some bike to work month stuff.. The group discussed making Critical Mass part of the event -> it is suppose to be a spontaneous event. It happens on the LAST FRIDAY OF EVERY MONTH AT THE MAIN GATES.

    Side Notes:

    The group discussed having 8 business meetings and 4 fun meetings a year. This was generally thought to be a good idea.  Business meetings would include the attendance of all officers, executive committee members, and those interested in agenda items to get involved. Fun meetings may include food, music, bike riding, children’s laughter, slide shows, bike stories, demonstrations, demo rides, and or any number of other exciting event/topics.

    Treasurer LB said most people have paid their dues, and those that haven’t should.

     


Nov
3
Mon
5:30 pm Light Up The Night
Light Up The Night
Nov 3 @ 5:30 pm – 7:00 pm
Light Up The Night
Come celebrate the start of daylight savings time and grab a free bicycle light at Light Up The Night to keep you safe during travels this winter! 🚲☀💡 Monday November 3, 2025, from 5:30-7pm at[…]
Nov
18
Tue
6:15 pm Winter Riding 101 @ Schlow Centre Region Library
Winter Riding 101 @ Schlow Centre Region Library
Nov 18 @ 6:15 pm – 7:15 pm
Winter Riding 101 @ Schlow Centre Region Library
Ride your bike even after the temperatures drop! Winter Riding 101 is a free class that offers tips and tricks to help you extend your cycling season for a few weeks in the fall or[…]
Jan
8
Thu
5:30 pm General Meeting
General Meeting
Jan 8 @ 5:30 pm – 7:00 pm
October 9, 2025 Meeting is at Centre Region Council of Governments, Planning Room, on the 2nd floor. Our general meeting will be on the 2nd Thursday of January, March, April, June, August, and October Zoom:[…]